Long-Term Thinking Pays Off

The Rosenberg Family Ranch in San Ardo is a beautiful piece of property near the Salinas River, featuring lovely oak trees, wild turkeys, deer – and a fine walnut orchard. Two of the wells on the property, drilled in 1997, had lost production over the years.

The Rosenbergs contacted WellJet last Spring, but didn’t want to risk the possibility of losing the wells during growing season. So the decision was made to wait until after the harvest.

Their Ford well had originally produced 1,200 GPM – but was now down to 400. The Cat well had provided 2,500 GPM – and had dropped off to 1,600.

The Rosenbergs had tried various rehabilitation efforts over the years, and were now interested in a long-term solution.

Downhole video by Welenco showed heavily encrusted production zones, and water sample analysis by SDK Laboratories revealed high counts of manganese and iron bacteria.

WellJet recommended a three-stage rehabilitation program, followed by regular maintenance. The Rosenbergs agreed with the recommendation, to be carried out by WellJet, Bobby Miller’s Pumping Service, and RediClean Water Well Chemicals under the supervision of Desert Water Solutions.

Bobby Miller’s crew pulled the pumps, and WellJet jetted the wells to remove the obstructions and break up deposits in the gravel pack. About 8’ of fill came in on the Ford well – and more than 50’ of fill on the Cat well. After jetting, Bobby Miller bailed the fill.

Desert Water Solutions provided the chemical treatment, tremied to the production zones by Bobby Miller – who then swabbed the wells for several hours with a custom-built dual-swab surge block. This brought in additional fill, and ensured a high bacterial kill rate.

After removing additional fill, Bobby Miller reinstalled the pumps.

The results were excellent: the Ford well – which the Rosenbergs had been considering replacing – returned to 900 GPM, an improvement of 225%. The Cat well came all the way back to 2,500 GPM, an improvement of 56%.

WellJet and Desert Water Solutions provided a customized maintenance program for both wells, designed to keep them operating at peak efficiency for years to come.

 

Well Photo1

Well Photo2

Well Photo3

     

INFORMATION

FORD

CAT

Drill date

1997

1997

Total Depth

50’

114’

Construction

Mild steel

Mild steel

Perfs

Wire-wrapped screen

Wire-wrapped screen

Perf zone

20’-50’ (30’)

42’-114’ (72’)

OD

20”

20”

SWL

18’

16’

Original flow

1,200 GPM

2,500 GPM

Pre-WellJet flow

400 GPM

1,600 GPM

Pre-WellJet Drawdown

25’-30’ (breaking suction)

 

Post-Rehab flow

900 GPM

2,500 GPM

Flow Improvement

225%

56%